City of Colton
Photos
|
Services rendered:
●
Construction Inspection, Construction Management/Inspection/Installation,
Interconnect Design, Municipal Engineering, PS&E, Signal Design, Signal
Timing, Traffic Engineering, Traffic Signal System Design
|
Final for Traffic Signal Installation at Valley Ave. and 3rd St. and Traffic Signal Modification at Valley Ave. and Rancho Ave. Traffic Signal Modification at Colton Ave. and Mt. Vernon Ave. Traffic Signal Modification at La Cadena Blvd. and "C" St.
Final for Traffic Signal Installation at Valley Ave. and 3rd St. and Traffic Signal Modification at Valley Ave. and Rancho Ave.
Projects:
●City Traffic Engineering/Municipal Engineering Services: Municipal
Engineering, Traffic Engineering
●On-Call Traffic Signal Construction Inspection Services for City of Colton:
Construction Management/Inspection/Installation
●Plan Checking Services for a Signal at Mt. Vernon & Cooley Dr.: Plan
Checking
●Preparing PS&E Packages for Traffic Signals: Construction
Management/Inspection/Installation, Interconnect Design, PS&E, Signal Design,
Signal Timing
●Providing On-Call Traffic Signal Plan Checking Services for City of Colton:
Interconnect Design, PS&E, Signal Design, Traffic Signal System Design
●Providing Traffic Signal Inspections for 3 New Locations: Construction
Inspection
●San Bernardino Freeway (I-10) WB Off-Ramp at 9th St./Valley Ave. Traffic
Study: Traffic Engineering
●Traffic Signal Modification Assessment for 7th St. and La Cadena Blvd.:
Traffic Engineering
|